Woodstock Cabin Addition

Project in progress. Check back periodically for more details!

UPDATE 6/12/21: Oak timber framing for the breezeway has been installed!

UPDATE 8/24/22: Walls framed and wrapped. Roofing installed. Windows and exterior doors set!

UPDATE 2/2/23: Siding has been progressing, including random width board-on-board and shingles at the gable faces.